Two new Impact Area pages
Trades & Services and Community & Safety, built with your copy and photographs.
Confirm the layout and the content placement are right.
The whole of Stage 2 in one place — where every piece sits today, and the four things that are ready for you to sign off now. Nothing here is on the live site.
Everything in the Stage 2 scope and exactly where each piece sits today — so you can see what is waiting on you, what is waiting on Future Anything, and what is ready to review right now.
Everything is built with the content you supplied on 12–13 August, unedited — we haven't rewritten or trimmed anything.
Each Open button below launches that item in a new browser tab. Inside, use the row of buttons across the top to move between pages or screens, then close the tab to come back here. Nothing saves or sends — click anything.
Trades & Services and Community & Safety, built with your copy and photographs.
Confirm the layout and the content placement are right.
All 18 pages, page by page — the 12 industries, the 4 existing Impact Areas and the 2 new ones.
Walk the pages that matter to you and confirm the entries read the way you want.
The six you sent, with your tracked changes applied and a change log on each revised page.
Confirm we read your mark-ups correctly.
All 14 Hub screens at desktop and mobile — landing, register, log in, dashboard, career education modules, Mini-PD library, teacher resources, events and feedback.
Approve the structure and layout. Final Hub content comes later from Future Anything.
The career infographic on your site today is a text panel. Inside item B there is a tab called Richer concept showing two of your careers with a more visual treatment — icons, the day-to-day as tiles, the pathway as visible stages. It uses your words exactly as supplied, with nothing new written and no figures invented.
It is not part of Stage 2 and it is not quoted. It is there in case it is of interest. If it is, we can price it separately; if not, the version in B is what gets built.
Most are quick confirmations. The four in the first group are the ones that genuinely hold up the staging build.
The content is prepared and the import is ready to run. Answers to the four blocking questions are the only thing between here and a staging site you can walk through.
We have the build booked in and can start as soon as we hear back. Expect all of Workstream 1 on staging within five working days of your answers, with a staging link to review before anything goes near the live site.